Installation site selection

1. When installing the air compressor, it is necessary to have a wide place with good lighting to facilitate operation and maintenance.

2. The relative humidity of the air should be low, less dust, the air is clean and well-ventilated, away from flammable and explosive, corrosive chemicals and harmful unsafe items, and avoid being near places that emit dust.

3. When the air compressor is installed, the ambient temperature in the installation site should be higher than 5 degrees in winter and lower than 40 degrees in summer, because the higher the ambient temperature, the higher the air compressor discharge temperature, which will affect the performance of the compressor, if necessary, the installation site should be set up ventilation or cooling devices.

4. If the factory environment is poor and there is much dust, it is necessary to install pre-filter equipment.

5. The air compressor units in the air compressor installation site should be arranged in a single row.

6. Reserved access, with conditions can be installed crane, to facilitate the maintenance of air compressor equipment.

7. Reserve maintenance space, at least 70 cm distance between the air compressor and the wall.

8. The distance between the air compressor and the top space is at least one meter.